01/12/2021- Present
Tunnelling Manager
KP Construction & Engineering Company LimitedProject Title: The Conversion of Overhead Line to Underground Cable System Tiwanon - Chaeng Wattana Road Project Pipe jacking TBMs 1500 mm
Project Title: The Conversion of Overhead Power Lines to Underground Cable System Along the Green Line Electric Train Route Pipe jacking TBMs 2000 mm
Project : Pipe Jacking 304 Chaeng Wattana – Pakkret Road Pipe jacking TBMs 2000 mm
Project : Underground cable system for MRT Yellow Line Project Pipe jacking TBMs 1800mm
Project : Wastewater treatment system construction MinBuri Pipe jacking TBMs 1000mm
01/03/2021 - 14/10/2021
TBM Superintendent
Ed Zublin AG – Singapore BranchProject : Baltic Offshore Pipeline Project, Trenchless Shore Crossing in Denmark and Poland. Construction of gas pipeline networks linking from Norway to Denmark and Poland / developed by both GAZ-SYSTEM S.A. and Energinet.dk
01/07/2018 - 30/03/2020
TBM Superintendent
Ed Zublin AG – Singapore BranchPROPOSED SEWERS IN UPPER CHANGI ROAD EAST AREA (CONTRACT 2) SINGAPORE PROJECT HIGHLIGHTS
♣ Construction of new sewers to enhance operational reliability of used water network by using the pipe jacking method
♣ Construction of 19 shafts with various diameter up to a maximum depth of 37m. Use of Shaft Sinking Method combined with Cast in-situ Method for small diameter shafts (ID4400)
♣ Construction close to residential buildings as close as 5m from shaft edge.
♣ Construction of 4.0km. sewer pipe of various diameters ID300mm. up to 2500mm. via pipe jacking.
01/04/2018 - 30/06/2018
TBM Superintendent
Ed Zublin AGProject : Nord Stream 2 Pipeline Project for the Trenchless Shore Crossing in Lubmin Germany, Construction of gas pipeline networks linking from the Germany to Europe/ developed by Nord Stream AG.
01/11/2017 - 31/03/2018
TBM Superintendent
Ed Zublin AG – Singapore BranchADVANCED SEWER DIVERSION (T3003) SINGAPORE PROJECT HIGHLIGHTS Reroute and expand the existing municipal sewer lines by using the pipe jacking method Construction of 55 shafts with various diameter up to a maximum depth of 38m. Construction of 5.6km. of various diameters ID300mm. up to 3 000mm. Curved pipe drives with tight radii of 300m.
30/04/2014 - 10/10/2017
TBM Superintendent
Ed Zublin AGProject : South Stream Offshore Pipeline Project, Trenchless Shore Crossing in Russian sector. Construction of gas pipeline networks linking from Russian Federations to Turkey / developed by South Stream B.V.
01/2013 - 21/04/2016
TBM SuperIntendent
Zublin AG – Abu Dhabi BranchSTEP LS01 & LS02 Project; Abu Dhabi, UAE. Construction of sewer tunnel networks for Abu Dhabi Sewerage Scheme scope include construction of 250 temporary shaft diameter varies from 3.0m to 14.6m. as well as manholes, total length of tunnel 45 Km. constructed by Pipe Jacking Method with pipe diameter varies from ID700mm. up to ID3100 mm. the longest drive of the project is 1,500m.(ID3100mm)
01/2012 – 12/2012
TBM SuperIntendent
Ed Zublin AG – Singapore BranchJURONG Eastern Catchment Area Package 2 & Package B – JURONG, Singapore
Construction of shaft and tunnel as well as manholes with HDPE liners.
- Tunnel ∅ID 2,500mm. = 1,300 m.
- Tunnel ∅ID 1,350mm. = 135 m.
- Tunnel ∅ID 3,000mm. = 2,000 m.
01/2012 - 12/2012
Senior TBM Operator
Ed Zublin AG – Singapore BranchSubmarine Gas Transmission Pipe Line Project, Singapore Construction of ID2000 reinforced concrete tunnel for gas transmission line to TUAS Power Station, the tunnel run across the harbour with busy sea lane above. The length of single drive is 1,550m. has completed within 123 days.
04/2010 - 01/2011
Tunnel Boring Machine Operator
Zublin (Australia) Pty, Ltd. AustraliaSouthern Seawater Desalination Plant Construction of 861m. length, ID2400mm. seawater intake tunnel and 963m. length, ID2000mm. seawater outlet tunnel.
11/2009 - 03/2010
Tunnel Boring Machine Operator
Ed. Zublin AG – Singapore BranchSewerage Scheme to Serve Pasir Ris / Tampines - Package 2 Construction of ID1500mm., ID2000mm. and ID3000mm. Sewer Tunnels and Sewer Manholes
02/2008 - 08/2009
Tunnel Boring Machine Operator
MMZJV, AustraliaQuinns Main Sewer (Alkimos), Perth, Australia. Construction of a 5km. ID2000mm. sewer by pipe jacking method.
05/2007 - 01/2008
Tunnel Boring Machine Operator
Zublin (Thailand) Co.,Ltd. Thailand01/2007 - 05/2007
Tunnel Boring Machine Operator
Zublin International GmbH, India EWPL Project-Gauthami Godavari River Crossing, India. Construction of 3 shafts by caisson sinking method with a maximum depth of 30 m. The circular shafts diameters ranged 10.3 m. and 8.0 m. And 2.5 km. of 2400 mm. concrete pipe inside diameter by Pipe jacking method include 1200 mm. steel Pipe Pushing (Gas pipeline) into Concrete pipe.06/2006 - 12/2006
Tunnel Boring Machine Operator
Ed. Zublin AG, Singapore Branch KJLS - Kranji Link Sewers Project, Construction of 10 shafts by caisson sinking method and 850 m. of Sewers pipes 1200 mm. inside diameter and 150 m. of Sewers pipes 1650 mm. inside diameter by Pipe jacking method.07/2005 - 06/2006
Tunnel Boring Machine Operator
Zublin (Thailand) Co.,Ltd. Thailand05/2003 - 06/2005
Tunnel Boring Machine Operator
Ed. Zublin AG, Singapore Branch UTLS - Upper Thomson Link Sewers Project Construction of 32 shafts by caisson sinking method with a maximum depth of 40 m The circular shafts diameters ranged from 4.4 to 8.8 m. and rectangular shafts is 7.3 m. x 4.2 m. And 5 km. of Sewers pipes 400 mm., 600 mm., 1200 mm. and 2400 mm. inside diameter by Pipe jacking method.08/2001 - 04/2003
Tunnel Boring Machine Operator
Bilfinger Berger (Thai) Construction Co.,Ltd. ThailandUnderground Tunnel for Metropolitan Electricity Authority Project (MEA) Shaft construction dia. 6.3 m. to 10.0 m.x depth between 10.0m. to 20.0m. and pipe jacking size between ID.1200mm to 2600mm., with total length 4,500 m.
11/1999 - 07/2001
Tunnel Boring Machine Operator
Bilfinger + Berger Bauaktiengesellschaft (Hong Kong Branch) Aberdeen Ap lei Chau and Pok Fu lam Sewerage Stage 1B Project HongKong, China Consist of Pipe jacking ID.1500mm., with total length 2,200 m.01/1999 - 10/1999
Tunnel Boring Machine Operator
Bilfinger Berger (Thai) Construction Co.,Ltd. Thailand.MRTA - Silom Station, Bangkok .Drainage diversion works by Microtunneling method.
02/1998 - 12/1998
Tunnel Boring Machine Operator
1. MRTA – Lumpini Station Bangkok. Drainage diversion works by Microtunneling method.2. Coco Power Plant, Rayong. Road crossing by Microtunneling method.