01/12/2021- Present

Tunnelling Manager

KP Construction & Engineering Company Limited

Project Title:
The Conversion of Overhead Line to Underground Cable System Tiwanon - Chaeng Wattana Road Project Pipe jacking TBMs 1500 mm

Project Title: The Conversion of Overhead Power Lines to Underground Cable System Along the Green Line Electric Train Route Pipe jacking TBMs 2000 mm

Project : Pipe Jacking 304 Chaeng Wattana – Pakkret Road Pipe jacking TBMs 2000 mm

Project : Underground cable system for MRT Yellow Line Project Pipe jacking TBMs 1800mm

Project : Wastewater treatment system construction MinBuri Pipe jacking TBMs 1000mm

01/03/2021 - 14/10/2021

TBM Superintendent

Ed Zublin AG – Singapore Branch
Project : Baltic Offshore Pipeline Project, Trenchless Shore Crossing in Denmark and Poland. Construction of gas pipeline networks linking from Norway to Denmark and Poland / developed by both GAZ-SYSTEM S.A. and Energinet.dk

01/07/2018 - 30/03/2020

TBM Superintendent

Ed Zublin AG – Singapore Branch
PROPOSED SEWERS IN UPPER CHANGI ROAD EAST AREA (CONTRACT 2) SINGAPORE PROJECT HIGHLIGHTS
 
♣ Construction of new sewers to enhance operational reliability of used water network by using the pipe jacking method
 
♣ Construction of 19 shafts with various diameter up to a maximum depth of 37m. Use of Shaft Sinking Method combined with Cast in-situ Method for small diameter shafts (ID4400)
 
♣ Construction close to residential buildings as close as 5m from shaft edge.
 
♣ Construction of 4.0km. sewer pipe of various diameters ID300mm. up to 2500mm. via pipe jacking.

01/04/2018 - 30/06/2018

TBM Superintendent

Ed Zublin AG
Project : Nord Stream 2 Pipeline Project for the Trenchless Shore Crossing in Lubmin Germany, Construction of gas pipeline networks linking from the Germany to Europe/ developed by Nord Stream AG.

01/11/2017 - 31/03/2018

TBM Superintendent

Ed Zublin AG – Singapore Branch
ADVANCED SEWER DIVERSION (T3003) SINGAPORE PROJECT HIGHLIGHTS Reroute and expand the existing municipal sewer lines by using the pipe jacking method Construction of 55 shafts with various diameter up to a maximum depth of 38m. Construction of 5.6km. of various diameters ID300mm. up to 3 000mm. Curved pipe drives with tight radii of 300m.

30/04/2014 - 10/10/2017

TBM Superintendent

Ed Zublin AG
Project : South Stream Offshore Pipeline Project, Trenchless Shore Crossing in Russian sector. Construction of gas pipeline networks linking from Russian Federations to Turkey / developed by South Stream B.V.

01/2013 - 21/04/2016

TBM SuperIntendent

Zublin AG – Abu Dhabi Branch
STEP LS01 & LS02 Project; Abu Dhabi, UAE. Construction of sewer tunnel networks for Abu Dhabi Sewerage Scheme scope include construction of 250 temporary shaft diameter varies from 3.0m to 14.6m. as well as manholes, total length of tunnel 45 Km. constructed by Pipe Jacking Method with pipe diameter varies from ID700mm. up to ID3100 mm. the longest drive of the project is 1,500m.(ID3100mm)

01/2012 – 12/2012

TBM SuperIntendent

Ed Zublin AG – Singapore Branch
JURONG Eastern Catchment Area Package 2 & Package B – JURONG, Singapore
Construction of shaft and tunnel as well as manholes with HDPE liners.
  • Tunnel ∅ID 2,500mm. = 1,300 m.
  • Tunnel ∅ID 1,350mm. = 135 m.
  • Tunnel ∅ID 3,000mm. = 2,000 m.

01/2012 - 12/2012

Senior TBM Operator

Ed Zublin AG – Singapore Branch
Submarine Gas Transmission Pipe Line Project, Singapore Construction of ID2000 reinforced concrete tunnel for gas transmission line to TUAS Power Station, the tunnel run across the harbour with busy sea lane above. The length of single drive is 1,550m. has completed within 123 days.

04/2010 - 01/2011

Tunnel Boring Machine Operator

Zublin (Australia) Pty, Ltd. Australia
Southern Seawater Desalination Plant Construction of 861m. length, ID2400mm. seawater intake tunnel and 963m. length, ID2000mm. seawater outlet tunnel.

11/2009 - 03/2010

Tunnel Boring Machine Operator

Ed. Zublin AG – Singapore Branch
Sewerage Scheme to Serve Pasir Ris / Tampines - Package 2 Construction of ID1500mm., ID2000mm. and ID3000mm. Sewer Tunnels and Sewer Manholes

02/2008 - 08/2009

Tunnel Boring Machine Operator

MMZJV, Australia
Quinns Main Sewer (Alkimos), Perth, Australia. Construction of a 5km. ID2000mm. sewer by pipe jacking method.

05/2007 - 01/2008

Tunnel Boring Machine Operator

Zublin (Thailand) Co.,Ltd. Thailand

01/2007 - 05/2007

Tunnel Boring Machine Operator

Zublin International GmbH, India EWPL Project-Gauthami Godavari River Crossing, India. Construction of 3 shafts by caisson sinking method with a maximum depth of 30 m. The circular shafts diameters ranged 10.3 m. and 8.0 m. And 2.5 km. of 2400 mm. concrete pipe inside diameter by Pipe jacking method include 1200 mm. steel Pipe Pushing (Gas pipeline) into Concrete pipe.

06/2006 - 12/2006

Tunnel Boring Machine Operator

Ed. Zublin AG, Singapore Branch KJLS - Kranji Link Sewers Project, Construction of 10 shafts by caisson sinking method and 850 m. of Sewers pipes 1200 mm. inside diameter and 150 m. of Sewers pipes 1650 mm. inside diameter by Pipe jacking method.

07/2005 - 06/2006

Tunnel Boring Machine Operator

Zublin (Thailand) Co.,Ltd. Thailand

05/2003 - 06/2005

Tunnel Boring Machine Operator

Ed. Zublin AG, Singapore Branch UTLS - Upper Thomson Link Sewers Project Construction of 32 shafts by caisson sinking method with a maximum depth of 40 m The circular shafts diameters ranged from 4.4 to 8.8 m. and rectangular shafts is 7.3 m. x 4.2 m. And 5 km. of Sewers pipes 400 mm., 600 mm., 1200 mm. and 2400 mm. inside diameter by Pipe jacking method.

08/2001 - 04/2003

Tunnel Boring Machine Operator

Bilfinger Berger (Thai) Construction Co.,Ltd. Thailand
Underground Tunnel for Metropolitan Electricity Authority Project (MEA) Shaft construction dia. 6.3 m. to 10.0 m.x depth between 10.0m. to 20.0m. and pipe jacking size between ID.1200mm to 2600mm., with total length 4,500 m.

11/1999 - 07/2001

Tunnel Boring Machine Operator

Bilfinger + Berger Bauaktiengesellschaft (Hong Kong Branch) Aberdeen Ap lei Chau and Pok Fu lam Sewerage Stage 1B Project HongKong, China Consist of Pipe jacking ID.1500mm., with total length 2,200 m.

01/1999 - 10/1999

Tunnel Boring Machine Operator

Bilfinger Berger (Thai) Construction Co.,Ltd. Thailand.
MRTA - Silom Station, Bangkok .Drainage diversion works by Microtunneling method.

02/1998 - 12/1998

Tunnel Boring Machine Operator

1. MRTA – Lumpini Station Bangkok. Drainage diversion works by Microtunneling method.
2. Coco Power Plant, Rayong. Road crossing by Microtunneling method.

02/1997 - 01/1998

Tunnel Boring Machine Operator

Bangkok Waste Water-Stage I, Package IS#2 Project Drainage works by Microtunneling method.

09/1996 - 02/1997

Civil Foreman

Baan Sub Surawonge Bored Piling Project. Bangkok, Thailand.

10/1993 - 11/1995

Technician

ESSO Refinery Expansion Project Civil works contract. Sriracha, Chonburi Province, Thailand.